Reading the register.
Reading the register.
Intelligence with context. Foresight that shapes decisions. The DIWAN register publishes commissioned studies, briefings, and market intelligence across sectors and jurisdictions.
The signal already reaches most Zimbabweans; the price of data, the power behind each site and the state's paper processes do not. Five moves that would unlock growth, and who can realistically pay for each
Zimbabwe's economy grew about 8% in 2025, yet only about 42% of people use the internet. Mobile coverage is not the main problem: LTE covers about 96% of the urban population and there are close to one mobile connection per person. The binding constraints are the price of data (Cable.co.uk ranks Zimbabwe the most expensive of 237 territories at US$43.75 per GB), unreliable power at sites and digital centres, and a government that still runs many licences and permits on paper. This study maps the gap, sets out five sequenced moves (cheaper data, power-resilient shared rural sites, satellite-backed digital centres, interoperable government rails, and local data-centre capacity) and identifies who funds each. Because Zimbabwe is still in arrears to international lenders, most money today comes from operators, the 1.5% Universal Service Fund levy, Chinese export credit and private infrastructure companies. An illustrative model shows rural shared sites only reach low-teens returns with roughly 40% public co-funding.
A Comprehensive Analysis of Future Economic Indicators
Zimbabwe's GDP is expected to reach USD 51.2 billion by 2025, with a real GDP growth rate forecasted at 8.1%. The population is projected to grow to 17.0 million, with urbanisation increasing to 40.5%. Despite challenges, these indicators suggest a potential for economic recovery and development.
Uganda's power problem has moved from generation to delivery. Installed capacity reached about 2,048 MW in 2024 against a 2025 system peak of about 1,351 MW, but 44.7% of people still lack access, losses run near 17% and manufacturers report frequent outages. The 2030 National Energy Compact targets 85% access, US$17.7 billion of investment (US$9.4 billion private) and 2,712 mini-grids from a base
Read this studyPhoto: Kia Sheikhy